Project Profiles

PROJECT CLIENT SCOPE DATE
Tree Lowering Project Tana Oil &
Gas Corporation
Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (120) winch and custom over boarding sheave skid package. 2007
Independence HUB - Merganser Helix Energy Solutions Provide custom umbilical pull-in system on the Anadarko Independence FPF for the installation of (1) umbilical. The system include a VB50 (26) winch and custom winch tower. 2007
Campos Basin Project Devon Energy Brazil Provide custom riser and power cable pull-in systems on the Devon Platform for the installation of (2) risers and (1) power cable. The riser system includes include a VB75 winch, a custom winch skid package and (4) rolling blocks. The power cable system includes a VB12.5 winch and (2) rolling blocks. 2007
Atlantis - Umbilical BP Americas Provide custom umbilical pull-in systems on the Atlantis PQ for the installation of (4) umbilical. The umbilical system includes include a VB300 (70) winch, a custom winch/ sheave skid package and (2) sheave assemblies. 2007
URSA - Umbilical Oceaneering International Provide custom umbilical pull-in systems on the URSA TLP for the installation of (1) umbilical. The umbilical system includes include a VB75 winch. 2007
Thunder Horse - Debris Recover BP Americas Provide custom recover system onboard the Maresk Reliance for the recovery of debris on the seafloor. The recovery system includes a VB80 (50) winch and custom over boarding sheave skid package that extended off the side of the vessel. 2007 - 2006
Eugene Island 314A - Jacket Repair Exxon/Mobil Provide custom lowering system onboard the platform for the removal of existing jacket members and for the lowering of new jacket members. The system includes (6) VB30 winches, (2) VB 12.5 Winches, (8) custom skid packages, (4) sheave assemblies and (6) rolling blocks. 2007 - 2006
BP - Amherstia Platform BP Trinidad & Tobago Provide custom jacking system onboard the Amherstia platform for up righting the Gas Compressor Skid. The system includes (4) jacks with custom jacking frames. 2007 - 2006
Okume Complex - EG, West Africa Amerada Hess Corporation Provide (2) custom riser systems one onboard the Okume platform and the second onboard the Oveng platform. Each system includes a VB200 (42) winch, a custom winch/sheave skid and (2) sheave assemblies. Also we are providing a custom power cable system onboard the Okume B/D platforms. The system includes (2) VB12.5 winches, (2) custom sheave skids and (2) rolling blocks. 2007 - 2006
Chevron - Tahiti Platform Subsea 7 Marine Provide custom umbilical pull-in systems on the Chevron's Tahiti SPAR for the installation of (4) umbilical. The umbilical system includes include a VB100 winch. 2007
Hang-Off Skid Package, Subsea 7 Brazil Subsea 7 Marine Provide Engineering, drawings 2006
"Cottonwood" Subsea Tree Installation Petrobras America, Inc. Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (42) winch and custom over boarding sheave skid package. 2006
West Delta 95 - X-Clamp Installation BP Americas Provide custom lowering system onboard the platform for the lowering of (2) X-Clamp Braces. The lowering system includes (4) VB30 winches. 2006
Platform - Bridge Repair Apache Corporation Provide custom lifting truss system that cantilevers off one platform for holding a damaged bridge while it is being repaired. The system includes a VB80 (50) winch, VB30 winch, a custom truss skid, and (2) sheave assemblies. 2006
Eugene Island 330 - Deck Lift Devon Energy Provide custom jacking system onboard the platform for the lifting. The jacking system includes (32) jacking rams. 2006
Shell - Deimos Subsea 7 Marine Provide custom umbilical pull-in systems on the Shell's Demois platform for the installation of an umbilical. The umbilical system includes a VB80 (50) winch, custom cantilever sheave skid, and (2) rolling blocks. 2006
Subsea Tree Lowering Newfield Exploration Company Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB300 (70) winch and custom over boarding sheave skid package. 2006
Chevron - Tahiti J. Ray McDermott Provide (2) separate custom riser pull-in system onboard the Chevron's Tahati SPAR. One for the installation of (6) Flowline Risers, and the other for the steering of (2) Export Risers during installation. The flowline riser system includes a custom chain jack, (2) powered chain turndown sheaves assemblies, (3) horizontal chain assemblies, and a custom chain locker to store 1700-ft of 3 ¾" chain. The export riser system includes (2) VB75 winches. 2007 - 2006
Lobito Tomboco - Angola , West Africa Subsea 7 Marine Provide custom umbilical/jumper pull-in systems on the Chevron's Compliant Tower for the installation of (4) umbilicals & (7) jumpers. The system includes (2) VB75 winches, (2) custom sheave skid, an I-Tube Sheave Assembly and (7) rolling blocks. 2006 - 2005
BP - Mad Dog Skid Installation BP Americas Provide custom lifting/installation systems on the Mad Dog Platform for lifting, cross hauling under the deck and then setting. The system includes (4) VB30 winches, (2) multiple cantilever sheave skids, and (4) sheave skids. 2006
Subsea Tree Lowering Deep Gulf Energy Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (42) winch and custom over boarding sheave skid package. 2006
Genghis Khan Riser Installation (Marco Polo) Anadarko Petroleum Corporation Provide custom riser installation systems on the Marco Polo TLP for installing (2) production risers. The system includes a VB300 (70) winch used for pull-in the risers, a VB100 and VB80 (50) winches for steering the riser. Each winch has a sheave skid and a sheave assembly. 2005
Independence HUB Subsea 7 Marine Provide custom umbilical pull-in system on the Anadarko Independence FPF for the installation of (4) umbilicals. The system includes a VB50 winch and custom winch tower. 2007
Genghis Khan Umbilical Installations (Marco Polo) J. Ray McDermott Provide an umbilical pull-in winch with operators for the installation of the Genghis Khan control umbilical on the Marco Polo TLP. 2005
GC 518 Riser Installations Anadarko Petroleum Corporation Supply 300-Ton, 100-Ton and 80-Ton winches with beampackages and turndown sheaves for the installation of two 6-inch risers on the Marco Polo TLP 2005
Thunder Horse riser installation chain jack refurbishment BP Americas Re-furbish and repair 600-Ton hydraulic chain jack, perform dynamic load test and acceptance tests on shore, fabricate shipping and handling frame 2005
Fabricate and SIT Atlantis seabed riser stabilization system BP Americas Fabricate thirteen (13) seabed chain stopper systems and six (6) pipeline yokes to stabilize Atlantis risers at seabed. Provide full fabrication traceability and full SIT in Houston . 2005
Lorien Tie-backs Noble Energy & Shell Offshore Provide custom winch systems on the Shell Bullwinkle platform for the removal of existing flowlines and umbilicals. Installed in two (2) J-tubes and the installation of new risers and umbilicals in the same J-tubes. 2005
J-Bellus Umbilical Installation Shell Offshore & LLOG Exploration Provided 100-Ton winch with custom beam package and multiple sheaves for the installation of the J-Bellus umbilical at the Shell Brutus TLP 2005
Triton/Goldfinger Technip & Dominion Exploration & Production Provided 300-ton, 80-ton and two (2) 30-ton winches with custom beam packages and multiple turndown sheaves for the installation of the production risers at the Devils Tower par for the Triton/Goldfinger developments 2005
K-2 Riser Installations Technip & ENI Supply 300-Ton, 100-Ton and 30-Ton winches with beam packages and turndown sheaves for the installation of four (4) 6-inch risers on the Marco Polo TLP 2005
Shell Glider umbilical installation (Brutus TLP) Subsea7 & Shell Offshore 100-ton or 200-ton hydraulic winch pulling system (final scope to be determined) including all layout engineering, drafting and project management and operations personnel. 2003
Multiple stranded vessel salvages (post Hurricane Katrina) Various Provide barge mounted custom pulling systems with capacities ranging from 250 to 3,000 tons for the salvage of stranded vessels and dry docks post Hurricane Katrina 2005
Horn Mountain Oil Export Riser SCR replacement Project BP Americas Design and engineer complete repair procedure, furnish all equipment (including two (2) 600-Ton hydraulic chain jacks) and operators for the replacement of the Flex Joint on the main oil export riser 2005 - 2004
Thunder Horse SCR Installations Heerema & BP Americas Provide eleven (11) hydraulic winch systems (200-Ton to 30-Ton) for the installation of production and export risers on the Thunder Horse PDQ 2005 - 2004
Thunder Horse Jumper Installation Subsea 7 & BP Americas Rental of 200-Ton series 120 hydraulic winch for lowering 70-ton jumpers in 6,000 feet of water. Additional 100-Ton winch for pennant line handling. Provide operators and technicians 2005 - 2004
Thunder Horse Umbilical Installation Subsea 7 & BP Americas Provide 80-Ton hydraulic winch with level wind for the installation of multiple umbilicals on the Thunder Horse platform. Provide operators and technicians. 2005 - 2004
Thunder Horse Water Injection Riser Installation Technip & BP Americas Provide five (5) hydraulic winch systems (200-Ton to 40-Ton) for the installation of Water Injection Risers on the Thunder Horse PDQ 2005 - 2004
Conoco Magnolia Export Lines Allseas Marine & Shell Offshore Provide 100-Ton winch support on custom beam packages for two (2) J-Tube pulls on the Shell Enchilada platform 2004
Jack and Shim Holstein Drilling Rig BP Americas Provide flat jacks and associated equipment and operators to jack and shim the 4,000 Ton Holstein drilling module on the Spar after installation 2004
Pompano I-Tube Retrofit BP Americas Provide two (2) 30-Ton hydraulic winches with operators for the installation of retrofit I-tubes on the Pompano platform. 2004
Marco Polo Riser Installation Cal Dive International 200-Ton winch and operations personnel for multiple riser installations on TLP 2004
Marco Polo Subsea lowering winch Cal Dive International 100-Ton winch outfitted with 6,500 feet of wire for the Subsea lowering of a 16-Ton clump weight for crane block stabilization 2004
Taylor Energy Jacket Launch McDermott & Taylor Energy Provide two (2) synchronized 450-Ton pull systems on the I-600 barge for the launch of a Taylor Energy jacket 2004
Exxon Kizomba "A" Umbilical Installation Saipem 100-Ton winch on custom support skid plus operators for the installation of multiple umbilicals onto an FPSO 2004
Onshore Pipe Spooling Technip Provide 100-Ton constant tension winch for onshore pipe spooling operations at spool base 2004
BP Thunder Horse SCR and WI Riser Installation Heerema, Technip & BP Americas Provision of all winches, custom support structures, engineering, fabrication, project management, operations personnel for the installation of all risers on the Thunder Horse PDQ. 2004 - 2003
Amerada Hess Conger Jumper Installations Amerada Hess 100-ton winch and rigging for the subsea lowering of multiple jumpers in 2,000 ft water depth, including all layout engineering, drafting, project management and operations personnel 2003 - 2004
Shell Nakika SCR Installations - Phases 1 and 2 Shell Offshore & BP Americas Provide two (2) 50-Ton hydraulic winches and design and fabricated custom support structure to support all winches, provide all associated equipment and personnel for the lateral steering of the Nakika SCR's during installation. 2004 - 2003
Gunnison Riser Installations Cal Dive International 200-ton winch and operations personnel for multiple riser installations on Spar 2003
Gunnison Foundation Installation Cal Dive International & Kerr McGee Provide 200-Ton hydraulic winch with all associated equipment and personnel for the seabed lowering operations for pile installation on the Gunnison project. 2003
BP Holstein Truss Loadout and Float Off Gulf Marine Fabricators & BP Americas Provide four (4) custom 750-Ton pulling and holdback systems with centralized PCL based control system for the loadout and controlled float off of the 11,000 Ton Holstein truss section. Include all PM, engineering, design, operations personnel and management. 2003
Shell Princess Rig Winch Lowering System Shell Offshore Provide 200-Ton winch with 7,500 feet of 2-1/2 inch wire, plus cantilever beam package and turndown sheave for the seabed installation of well heads, BOP's and subsea flowline initiation. 2003
Shell Princess Umbilical Installation Stolt & Shell Offshore Design and fabricate 65-feet beam package, provide 100-ton winch and all associated equipment and operators for the Princess umbilical installation. 2003
Shell Habanero Umbilical Installation Stolt & Shell Offshore Design and fabricate custom H-frame for turndown sheave support, provided 100-Ton hydraulic winch and all associated equipment and personnel for umbilical pull-in. 2003
Shell Llano Umbilical Installation (Auger TLP) Subsea 7 & Shell Offshore Design and fabricated custom H-frame for turndown sheave support, provided 100-Ton hydraulic winch and all associated equipment and personnel for umbilical pull-in. 2003
Shell Glider Riser Installation (Brutus TLP) Subsea 7 & Shell Offshore Load testing and certification of 275-Ton chain jack, offshore operation of chain jack 2003
Shell Glider Umbilical Installation (Brutus TLP) Subsea 7 & Shell Offshore 100-Ton hydraulic winch pulling system including all layout engineering, drafting, project management and operations personnel. 2003
Shell Nakika Umbilical Installations Subsea 7 & Shell Offshore Provide three (3) 100-Ton winches with turndown sheaves, all associated equipment and operators for the installation of the Nakika platform umbilicals 2003
King Eastern TSJ Repair BP Americas Project Management, engineering, design, provision of eight (8) winch systems, underwater rigging, operations management, operations personnel (8) for the removal and re-installation of SCR on the Marlin TLP. 2002
Multiple BP Jacket loadouts at McDermott BP Americas & J Ray McDermott Two (2) 500-Ton pulling systems using blocks and winches 2002
Nansen Riser Installation Cal Dive International & Kerr McGee Provide 200-Ton hydraulic winch, all associated equipment and operations personnel for the pull-on of an SCR on the Nansen Spar 2002
Williams MP 261 Deck Pancake Installation Williams Co. Engineer and fabrication of custom support skids, all PM and layout engineering, provide four (4) 30-Ton hydraulic winches with all associated equipment and personnel for the installation of a 65-Ton deck pancake on the MP 261 platform 2002