Versabar's Claw Retrieves 8-pile Deck

Versabar's twin Claw assemblies recovered an 8-pile deck from just over 300 feet beneath the surface of the Gulf of Mexico. Overcoming numerous underwater obstacles, the VB 10,000 lift team maneuvered carefully to insert the tines into the structure before bringing it to the surface, where it was deposited on a transport barge. Including the weight of the Claw, the total lift registered 4,000 tons, making it one of the heaviest VB 10,000 lift projects on record.

 