Deck Raising SIT

Versabar's patented deck raising technology will be used to simultaneously raise three platforms and their connecting bridges in order to restore a safe air gap between each platform's cellar deck and the mean water line. In order to perform accurate SIT (System Integration Testing), Versabar built a detailed deck and bridge construction at the Houston facility. In a multi-phase procedure, hydraulically and electronically synchronized rams were used to raise the structure 4 meters. The custom-engineered rams and their HPUs (Hydraulic Power Units) will be shipped offshore to perform the actual deck raising procedure of the multi-platform bridge-linked complex for an operator in Southeast Asia.

 
New Orleans      1111 Engineers Road     Belle Chasse, LA 70037     (504) 392-3200                                                            Houston     11349 FM 529 Road     Houston, TX 77041     (713) 937-3100
Copyright © 2017 Versabar, Inc. All rights reserved. Terms of Use | Privacy Policy